Make Homepage
Advertise
Partners
About Us

 

  Subscribe to the Newsletter
 
 
HOMEPAGE NEWS SECURITY COLUMNISTS OP-ED ARTICLES INTERVIEWS BOOK REVIEWS

Friday, 10 February 2012
Turkey Europe Middle East Caucasus Central Asia Russia Americas Asia Book Store World Economy Energy
New Thermal Power Plant in Denizli
Haluk Direskeneli
Haluk Direskeneli

printable version
send your friend

Tuesday, 17 June 2008

Your writer is happy to learn the announcement of new thermal power plant investment in Denizli District near KAKLIK village.

German E.ON with a local reputable Turkish local partner are planning to install a new thermal power plant to generate 800 MW electricity.

Prior to their EIA application, they will be organising "Public Information Meeting" on 17th June 2008 next week Details are in their web site www.eonturcasdenizlienerjisantrali.com .

Your writer feels happy to get such news on new energy investments in our local energy market,

provided that they are environmentally friendly,
they have completed all obligations for Environmental Impact Assessment Reports,
they have receive their license from the Local Regulatory Board,
design by local engineering companies as much as possible,
fabricate in the local fabrication plants as much as possible,
install by our local contractors, commissioned and supervised by our local engineering power,
operated by our own staff,
and regularly checked by our own Labor force in programmed maintenance.

Your writer sincerely feels that energy investors deserve all our support to complete those power plant investments.
They deserve since they risk their own property in order to get proper "Corporate Financing" at reasonable interest rates, and payment terms.

Hence your writer also tries to avoid them to make any technical mistakes in their power plant design, furthermore to avoid incorrect selection of the necessary equipment, wishes them to operate the plant for many years, to generate electricity which will push our economic prosperity.

After reading the Project Information Brochures, we feel that they are prepared quite good. There are not much project details, only already known details are disclosed. We learn that the output capacity is 800 MWe. They will install air cooled cooling system. That means they will not use much underground water. That is good for nearby ongoing agricultural activities. As a matter of fact, water is scarce at the neighbouring site.

We do not know details of selected gas turbine, steam turbine, HRSG, cooling system, heat balance diagrams, fabrication, construction, site installation contractors, whether they are local or foreign, details of budget figures for each item, the timetable for project execution.

It is your writer’s humble feeling that we should help and warn the investor not to repeat negative past examples in Antalya, Amasra, Yatagan, Afsin.

Foreign investor should be comfortable here that we are ready to help them. We should warn that they should not involve any corruption for speeding the public procedures, getting licenses, getting EIA approvals.

Local investor should feel comfortable that we shall be waring them in proper design, sourcing fabrication, site installation, logistics, public approvals.

We all expect that these energy investments will bring prosperity, employment and peace to the site. Maximised manpower, maximised engineering/ fabrication/ site installation capabilities will be employed.

After brief review of the project, we feel that we need answers to the following question,

- We need to learn the origins of the basic equipment, gas turbine, steam turbine, heat recovery steam generator, condenser, cooling tower. Since the foreign investor is from Germany, we may presume that the gas turbine will be of Siemens 2 each SGT5-4000F. Similarly steam Turbine will also be purchased from Siemens. What are the budget figures? When are they going to be delivered to site? How are they transported from which sea port?

- Since there is space limitations, the heat recovery steam generator will be of vertical gas pass, forced circulation type with supplementary firing. Who will be designing (CMI- Belgium?), who will be the fabricator (Cimtas, Gulermak) , who will be the construction company for site installation?

- It is our understanding that they have not applied yet to EIA certification nor to the Local regulatory board for licensing. There should not be any deviation of the information they will be declaring in the local information meeting and the information they will be furnishing to the public administrations.

- Since the site is 545 above sea level, they need to have supplementary firing in their heat recovery steam generators in order to reach 800 MWe electricity generation. We would be too pleased to learn the details of their burners, burner management systems, emission controls.

- We shall be too pleased to learn where they will be purchasing the cooling towers, air cooling system design and equipment. As we all know similar size thermal power in Baymina Temelli project, they could not install air cooling systems since the towers would be in the airplane landing route to Murted airforce airport.

- We need to know who will be the site constructor, what is the budget figure? They should be local companies. Local labours will be at the site.

- We need to know the project period, the importance milestones, we expect that 28-30 months could be a reasonable period.

- We need to know who will be making and paying the new 380 kV transmission and new natural gas incoming pipeline to the site.

- We need to kwo when the major equipment land transportation will be made, do we have sufficient roads for that transportation, who will be making the road reinforcement to enable the transportation?

- Do they have long term natural gas purchase agreement with respective organisations, do they have long term electricity sale agreements?

- Do they consider any capacity extension in the long term in 10-20 years time? Do they have enough space/ land for that extension??

- It is known that Siemens SGT5-4000F gas turbine is also suitable for IGCC. Do investors consider any IGCC application in future by gasification nearby Aydin, Yatagan indigenous lignite mines to avoid any energy supply risk?

- Generally we observe that after plant construction and generation of income in 3-5 years, the foreign party decides to sell her shares to the local partner and leave the project/ country. That was the case in Enron in Trakya, selling all her shares to her local partner, similarly Steag in Sugozu.
 
- How/ What  is the long term policy of the foreign party in this case?

- We will be too pleased to learn if the local party will be thinking to create local engineering department to carry out necessary basic engineering in the long term?

- Could we as Chamber of mechanical Engineers, organise annual technical tours for our members and ME students to the site in future?

Your writer hopes all the best, and the success to the investors in their new venture
 
Haluk Direskeneli
ODTU ME’1973 - Ankara MMO 6606
0533 353 1530-  0312 287 4914
URL: http://energynewsletterturkey.blogspot.com/

"Statements of facts or opinions appearing in the pages of Journal of Turkish Weekly (JTW) are not necessarily by the editors of JTW nor do they necessarily reflect the opinions of JTW or ISRO. The opinions published here are held by the authors themselves and not necessarily those of JTW or ISRO.

Materials may not be copied, reproduced, republished, posted without mentioning the mark of JTW or ISRO in any way except for your own personal non-commercial home use. For the news and other materials republished by the JTW you must apply the original publishers. JTW cannot give permission to republish this kind of materials."


 OTHER COMMENTS OF HALUK DIRESKENELI

2012 National Coal Policy for Turkey
7 February 2012

Konya Karapinar Coal Fields Ready for Thermal Power Plant Investment
11 January 2012

Previous Years' Comments

 USER COMMENTS

add comment

no comment
   TURKEY
   EUROPE
   MIDDLE EAST
   CAUCASUS
   CENTRAL ASIA
   RUSSIA
   AMERICAS
   ASIA
   AFRICA
   WORLD
   ECONOMY
   ENERGY
   INTERVIEWS
New Thermal Power Plant in Denizli New Thermal Power Plant in Denizli New Thermal Power Plant in Denizli New Thermal Power Plant in Denizli 
Journal of Turkish Weekly (JTW)
USAK House,
Ayten Sok. No:21
Mebusevleri, Tandogan, Ankara, Turkey