Afsin Elbistan Site Visit Follow-up
Haluk Direskeneli
Haluk Direskeneli

printable version
send your friend

Wednesday, 7 November 2007

This commentary is from USAK’s Energy Review Newsletter
http://www.turkishweekly.net/energy
To subscribe email to energyreview@turkishweekly.net

Last week on 31st October, 1-2 November, we were in Afsin Elbistan coal mine and thermal power plant premises to participate "Clean Coal Technologies" workshop, which was organized by Chambers of Mining, Mechanical, Chemical and Electrical Engineers of Turkey.

 

Our workshop agenda covered the following key subjects


-    Coal, its importance in Turkish Energy politics

-         Turkish Local energy resources, renewable potentials

-         Coal mine regional site planning

-         Economics of Elbistan Coal  Reserves,

-         Coal preparation, Enhancing, Selective Mining,

-         Recultivation of coal fields, Plant Recovery

-         Coal gasification at site, underground in the mine field

-         Coal gasification and liquefaction, above ground

-         Applicable Coal firing technologies,

-         Assessment of existing indirect pulverized coal firing

-         New Coal firing technologies, Circulating Fluidized Bed,

-         Integrated gasification combined cycle, applications

-         Flue gas desulphurization, e/p dust collectors,

-         New High Voltage Power transmission applications/ new solutions

 

We all know that the most important electric power generation projects are in "Afsin Elbistan" region where the largest lignite mines are located in Turkey; including almost half of the entire local proven reserves.

 

The existing power plants (Groups A and B) are based on pulverized coal firing technology which need relatively higher calorific value plus less moisture. Indirect type Pulverized coal firing technique can be successful only if you lower the moisture content and hence with higher the calorific value.


Available coal has a challenging content with very poor Low calorific value at about average 1150 kcal per kg, and 55% moisture, 20% ash, 1.5-4% sulphur.

 

We had the opportunity to listen/ visualize important presentations of Turkish academicians as well as market experts from public and private enterprises.

 

On Friday morning, we had the site visit to Elbistan lignite mine field in Kislakoy. Kislakoy Lignite mine fields were extraordinary. It was a huge man-made valley, with huge bucket wheelers, reclaimers, and stackers - coal band conveyors in operation. It is my feeling that there are so few similar examples on the world.


We then passed near recultivated coal fields with new trees planted on. It was an extraordinary application of recultivation on already depleted coal fields.


Finally we arrived to the thermal power plants, named A and B each with 1400 MWe installed electric generating capacity at full load.


Thermal Power plant A has no fluegas desulphurization. It was built in early 1980s, and its  firing technique is based on indirect firing of pulverized coal. Power plant (A) electrostatic precipitators are designed at low capacity dust collecting. One other set of E/Ps are loaded with 30% of incoming pulverized coal for drying prior to final firing in the combustion chamber. They cannot carry the extended load and they are out of service most of the time.


In the indirect coal firing technique, you dry the incoming coal/ lignite first in the coal mills with hot fluegas and then you send 30% of that pulverized wet coal into a second set of electrostatic precipitators for further drying with hot flue gas.


This “indirect firing” is borrowed from cement process; it may be called technology plagiarism, and that can not be proven after 20 years of interrupted operation. Operation was almost in mess, non-stop operation was not possible for 4 units altogether. When they call that “indirect coal firing” as the great western technology, I cannot conceal my smile.


E/Ps are out of service most of the time, and the 2 of total 4 stacks in operation pour huge flyash into atmosphere.  If E/Ps are not working properly in a thermal power plant, and furthermore if they have no Fluegas desulphurization on the stacks, then those power plants have to be stopped for operation since their harm to nearby environment is greater that the gain in electricity generation to the national grid.


We then visited the thermal power plant named B. That was brand new thermal power plant in final acceptance until year 2008.


We have been informed that the major foreign contractor company in charge of boilers has bankruptcy and the plant was completed by partner companies. Practically there is limited or almost no engineering responsibility in case of any boiler malpractice. Local contractor companies have limited major engineering and/or contractual responsibility; they just wait in their prefabricated site facilities to pass the final acceptance period.


Another point is that B Thermal power plant has no individual coal feeding system in operation. That is tendered but the new facility is expected to be in operation in the next 3-5 year time. So you have a thermal power plant with no incoming fuel facility to fire. There is one temporary coal feeding system 5-km long from nearby Thermal Power plant A, but that extension line seems not sufficient to operate the B unit in full capacity.


Thermal Power plant Unit-B is brand new, clean, and better, fully equipped with sufficient capacity flue gas desulphurization systems, with high capacity flue gas dust collecting electrostatic precipitators. We visualized almost no apparent dust on the existing stacks. It has 4 units of water based cooling towers and 2 common stack for all 4 units. We could see only harmless vapor outgoing from cooling towers.


You can collect the outgoing dust- fly ash, but thermal power plant has no ash dam/ no ash collecting area. Ash is collected in nearby open area and left there at the mercy of nature’s hard wind. When the hard wind blows, everywhere becomes under ash rain.


Another important point to note is that the thermal power plant- Unit-B is constructed at the center of new coal field, so you have no ability to get coal underneath of the power plant. That is another poor planning.


B plant was in operation with 2 units when we were in the plant. One boiler had boiler tube failure. The other was out of operation due to water shortage.


Both thermal power plants were equipped with water cooling. That water cooling process needs huge amount of water. Available water is not sufficient for both plants to be in full operation. If they do, then the nearby municipalities can not supply water to their citizens for their household consumption. We were told that new water dams were in tendering and they would be in operation within 3-5 year time. If you need that much water, why don’t you make the power plant design for air cooled operation? It would certainly cost some more money but you could have all boiler units in operation when needed.


This site report is a sort of black humor. Clean Coal Technologies Workshop in Elbistan will create a great opportunity for all interested local parties to enable them to investigate the possible/ applicable technologies, to investigate and assess the available intellectual capability of the local human resources. We were very pleased to join/ support/ contribute to the event, hope to organize similar events in international platforms.


Your comments are always welcome.  Thank you & best regards

Haluk Direskeneli- Energy Analyst
ODTU ME’1973 - Ankara MMO 6606

http://energynewsletterturkey.blogspot.com

 

This commentary is from USAK’s Energy Review Newsletter
http://www.turkishweekly.net/energy
To subscribe email to energyreview@turkishweekly.net


"Statements of facts or opinions appearing in the pages of Journal of Turkish Weekly (JTW) are not necessarily by the editors of JTW nor do they necessarily reflect the opinions of JTW or ISRO. The opinions published here are held by the authors themselves and not necessarily those of JTW or ISRO.

Materials may not be copied, reproduced, republished, posted without mentioning the mark of JTW or ISRO in any way except for your own personal non-commercial home use. For the news and other materials republished by the JTW you must apply the original publishers. JTW cannot give permission to republish this kind of materials."


 OTHER COMMENTS OF HALUK DIRESKENELI

2012 National Coal Policy for Turkey
7 February 2012

Konya Karapinar Coal Fields Ready for Thermal Power Plant Investment
11 January 2012

Previous Years' Comments

 USER COMMENTS

add comment

no comment
   TURKEY
   EUROPE
   MIDDLE EAST
   CAUCASUS
   CENTRAL ASIA
   RUSSIA
   AMERICAS
   ASIA
   AFRICA
   WORLD
   ECONOMY
   ENERGY
   INTERVIEWS
Afsin Elbistan Site Visit Follow-up Afsin Elbistan Site Visit Follow-up Afsin Elbistan Site Visit Follow-up Afsin Elbistan Site Visit Follow-up 
Journal of Turkish Weekly (JTW)
USAK House,
Ayten Sok. No:21
Mebusevleri, Tandogan, Ankara, Turkey